I recently bought a server rack with an ibm blade center H and blade center E but they require so much power that I would need to get a contractor but I was wondering what parts I should get for this to be easier and if there was a way I could do it myself.
Pic unrelated
>>963563
How big is the run from your switch box to the rack? How much power is your rack going to need? Does it need an ups system? I don't reccomend running the cable or hooking up to the switchboard yourself but knowing what you want is going to make getting a lower quote easier.
>>963568
Idk how much it's going to need cause I've never run it before but the H has 4 2880W power supplies and the E has 4 1800W ones. I have 2 ups alreday, one of them plugs directly into the wall and the other needs to be wired in as well. The run is not very far and I already have a lot of heavy duty cables